View Project

Work in Progress

Desert Dreams · Project Journal

Beautiful spaces.
In the making.

A closer look at the work behind our outdoor spaces. Follow landscaping, swimming pool and outdoor living projects through site photographs, progress updates and videos.

01 / On site

Work taking shape

From ground preparation and construction to planting and finishing details, this is where we share a project’s progress.

Latest from site

Explore the latest photographs and videos from our landscaping, swimming pool repair and balance tank construction projects below.

Watch the latest site videos ↓

02 / In motion

Our ongoing projects

Explore site updates by project, with photographs and videos documenting the work as it takes shape.

Swimming pool · Site update

Hillcrest — Swimming Pool Works

A site walkthrough at Hillcrest showing the mosaic pool, tiled steps and water jets in operation.

1 silent site video

Hillcrest · 23 seconds · No sound

Mosaic pool & water jets

A site walkthrough at Hillcrest showing the mosaic pool, tiled steps and water jets in operation.

Decking & outdoor living · Site update

Barari Villa — Outdoor Works

A walkthrough of the Barari villa’s poolside decking, side passage and outdoor seating areas.

1 silent site video

Barari Villa · 58 seconds · No sound

Poolside decking & outdoor spaces

A walkthrough of the Barari villa’s poolside decking, side passage and outdoor seating areas.

Balance tank construction · In progress

Golf Estate — Balance Tank Works

Site photographs documenting balance tank construction and pipework connections to the pump room system at Golf Estate.

3 site photographs
Golf Estate — Pipework installation in the excavated trench at Golf Estate for connections to the pump room system.

Golf Estate · Site photograph 1

Pump room system connections

Pipework installation in the excavated trench at Golf Estate for connections to the pump room system.

Golf Estate — A closer view of the pipe routes entering the balance tank area during ongoing construction.

Golf Estate · Site photograph 2

Pipe entries & wall junctions

A closer view of the pipe routes entering the balance tank area during ongoing construction.

Golf Estate — An overview of the balance tank blockwork, surrounding excavation and site access at Golf Estate.

Golf Estate · Site photograph 3

Tank construction overview

An overview of the balance tank blockwork, surrounding excavation and site access at Golf Estate.

Landscaping · In progress

Villanova — Outdoor Works

Progress updates from Villanova, featuring planting, garden lighting preparation, pathway paving and entrance details.

4 site photographs · 2 silent site videos
Villanova — Spotlights and cabling laid out beside the planted border as garden lighting installation progresses at Villanova.

Villanova · Site photograph 1

Garden lighting preparation

Spotlights and cabling laid out beside the planted border as garden lighting installation progresses at Villanova.

Villanova — Light-toned paving laid along the villa, with the adjacent ground being prepared for further outdoor works.

Villanova · Site photograph 2

Side pathway paving

Light-toned paving laid along the villa, with the adjacent ground being prepared for further outdoor works.

Villanova — Paving taking shape through the side passage while surface preparation continues beyond the gateway.

Villanova · Site photograph 3

Passage paving progress

Paving taking shape through the side passage while surface preparation continues beyond the gateway.

Villanova — Tiled entrance step and adjoining paving during ongoing finishing works at the Villanova villa.

Villanova · Site photograph 4

Entrance step detailing

Tiled entrance step and adjoining paving during ongoing finishing works at the Villanova villa.

Villanova · 1 minute 7 seconds · No sound

Illuminated planter edging

A Villanova site walkthrough showing raised planter borders with a recessed lighting strip and surrounding ground preparation.

Villanova · 38 seconds · No sound

Surface preparation in progress

A closer look at the prepared outdoor surface and ongoing work along the side passage at this Villanova project.

Pool repair · In progress

Jumeirah Islands — Swimming Pool Repair

Site updates from our swimming pool repair project in Jumeirah Islands, showing the drained pool and repair work in progress.

1 photo · 1 silent video
Drained blue mosaic swimming pool during repair work in Jumeirah Islands, with a pool ladder and cleaning tools.

Jumeirah Islands · Site photograph

Pool repair in progress

The drained blue mosaic pool during ongoing repair work, with the pool floor and walls exposed.

Jumeirah Islands · 44 seconds · No sound

A closer look at the repair work

A silent site walkthrough showing the drained pool, mosaic surfaces and equipment used during the ongoing repair.

Project journal · In progress

Golf Place

Construction updates from Golf Place, showing steel reinforcement, formwork and pipework on site.

2 site videos

Golf Place · 15 seconds

Steel reinforcement details

A close look at the steel reinforcement layout, tied intersections and shaped bars during ongoing construction at Golf Place.

Golf Place · 49 seconds

Formwork & reinforcement

A site walkthrough at Golf Place showing timber formwork, steel reinforcement and pipework as construction takes shape.

Scroll to Top